Configure a Meter Replacement
Configure Meter Replacement
A meter can fail or be replaced with a new one. If you only adopt the new meter reading, already recorded values could be lost, which leads to data gaps and calculation errors.
To prevent this, Eliona offers the option to configure an offset—either manually or through automatic detection.
Set an Offset for a Meter

Open the asset details of the affected asset.
Click on the attribute for which the offset should be configured [A].
Activate the offset function [B].
Choose one of the following methods:
Enter value manually: The offset value is permanently added to all new measured values.
Activate automatic calculation: Eliona automatically detects when a meter has been replaced.
If the new value drops by more than 10%, an offset is automatically set.
Instead of continuing to count with the new value, the previous value remains as the basis.
Last updated